1.1
|
Provide
pedestrian access on one side of the entire length of New Orleans
Road. Design the sidewalk/pathway to minimize impacts on wetlands
and other natural resources, provide for storm water drainage in ways
that do not degrade water quality, and include landscaping to enhance
the aesthetics of the area. |
|
|
|
|
1.2
|
Develop
vacant Town owned property at corner of New Orleans Road and Pope
Avenue as a Gateway Park with public art and fountains, to serve as
a landmark for this distinctive area of the community. |
|
|
|
|
1.3
|
Construct
a pathway on both sides of Pope Avenue from New Orleans Road to Cordillo
Parkway, to improve pedestrian access. Design the pathways with bridges
and boardwalks to minimize impacts on the wetlands in this area. (In
Ten Year CIP) |
|
|
|
|
1.4
|
Bury
the power lines along Pope Avenue from New Orleans Road to Cordillo
Parkway to improve the aesthetics of the roadway and
protect these facilities during storm events.
|
|
|
|