Redevelopment
Strategies
Bridge
to the Beach Area I: Pope Avenue Corridor
Sub-Area 2
Projects
| Description
of Proposed Project |
Implementation
Schedule
|
|
1
- 2
yrs.
|
3
- 6
yrs.
|
7
- 10
yrs.
|
| 2.1 |
Extend
Lemoyne Avenue to Cordillo Parkway and construct a pathway to improve
traffic and pedestrian circulation. (In Ten Year CIP) |
|
|
|
| 2.2 |
Redesign
South Forest Beach Drive as a two lane boulevard with a landscaped
median which includes bio-retention facilities in the median where
feasible, left turn lanes, pedestrian crossings and refuges, reduced
stormwater runoff, improved water quality of stormwater runoff, and
improved aesthetics of the roadway. |
|
|
|
| 2.1 |
|
|
|
This
proposal is to improve access into this densely developed area for
emergency vehicles as well as to provide alternative routes for vehicles
and pedestrians. |
| |
2.2 |
| The
proposed work on South Forest Beach Drive is to provide safe crosswalks
in areas currently heavily utilized by pedestrians, reduce vehicle
speeds, enhance stormwater management by reducing pavement, and enhance
the visual appearance of the roadway. |
 |
|