Additional Details for Mathews Drive/Marshland Road Roundabout

Status:   Complete   Complete Icon
Project Updates
  • 2/2/2016 - The American Council of Engineering Companies (ACEC) has awarded the Town of Hilton Head Island and its engineering consultant, Infrastructure Consulting & Engineering, PLLC of Charleston, South Carolina, the Engineering Excellence Award for the Mathews Drive – Marshland Road Roundabout Project. ACEC was formed in 1909 and represents our state and nation’s engineering industry. This project was the culmination of years of planning, engineering, land acquisition, and permitting, and has been extremely successful, alleviating traffic congestion, avoiding impacts to surrounding natural resources, and suffering no severe traffic accidents since construction was completed in April, 2015.
  • 4/17/2015 - Project Completed.
  • What Happened the Week of March 23, 2015

    • Concrete to be formed and poured for the new planted medians on Marshland Road approaching the roundabout
    • Left turn lane detour scheduled to end
    • Temporary pavement markings an signs to be installed for new roundabout
    • Removal of existing pavement on Mathews Drive coming southbound to the roundabout scheduled
  • What Happened the Week of March 16, 2015

    • Concrete formed and poured for new planted medians on Mathews Drive approaching the roundabout
    • Base and intermediate asphalt course of asphalt installed on right turn movement from Marshland Road to Mathews Drive
    • Stormwater pipe installed under Mathews Drive
  • What Happened the Week of March 9, 2015

    • Oyster shell concrete poured and completed for the remainder of the roundabout truck apron
    • Asphalt removal for new planted medians
  • What Happened the Week of March 2, 2015

    • Left turns from Marshland Road to Mathews Drive and left turns from Mathews Drive to Marshland Road became unavailable
    • Detour for left turns from Marshland Road directed to Leg-O- Mutton Road to Gardner Drive to William Hilton Parkway or turn right onto Mathews Drive to William Hilton Parkway
    • Left turns from Mathews Drive to Marshland Road detoured to the next traffic circle at Port Royal Plaza or to William Hilton Parkway
    • Demolition of existing asphalt for the new traffic circle interior
    • Grading and Compaction for the western side of the roundabout
    • Interior concrete curb poured for the remainder of the roundabout
  • What Happened the Week of February 23, 2015

    • Concrete curb formed and poured for the right turn from Marshland Road to Mathews Drive
  • What Happened the Weeks of February 9 - February 20, 2015

    • Grading of slopes in the northbound direction of Mathews Drive behind the new roundabout and curb
    • Existing concrete medians removed at the intersection
    • Preparation of the roundabout for the left lane detour
  • What Happened the Week of February 2, 2015

    • Concrete curb on eastern side of roundabout continued
    • Oyster shell concrete poured for eastern side of truck apron
    • Subgrade compacted, base and intermediate course of asphalt paved on eastern side of roundabout
  • What Happened the Week of January 26, 2015

    • Pathway removed on south west quadrant
    • Relocated pathway on south west quadrant formed with aggregate base
    • Concrete curb poured on eastern road edge and truck apron of roundabout
  • What Happened the Week of January 19, 2015

    • Grading and compaction for the new roadway section on Phase 1 (eastern side of roundabout)
    • Concrete curb formed for Phase 1
  • What Happened the Weeks of January 5 - January 16, 2015

    • Mobilization, construction staking and layout
    • Installation of silt fence and traffic control devices
    • Pavement removal, clearing and grubbing, and backfill installed within limits of Phase 1
Project Photos & Videos
  • Photo of Photo Display for the ACAE Engineering Excellence Award for the Mathews Drive – Marshland Road Roundabout Project.Photo Display for the ACAE Engineering Excellence Award for the Mathews Drive – Marshland Road Roundabout Project.
  • Photo of Concrete Curb Installation on MathewsConcrete Curb Installation on Mathews
  • Photo of Truck Apron Oyster Shell Concrete InstallationTruck Apron Oyster Shell Concrete Installation
  • Photo of Truck Apron Concrete Curb InstallationTruck Apron Concrete Curb Installation
  • Photo of Demolition of Asphalt for Interior of RoundaboutDemolition of Asphalt for Interior of Roundabout
  • Photo of Base and Intermediate Course of Asphalt Installed on East Side of RoundaboutBase and Intermediate Course of Asphalt Installed on East Side of Roundabout
  • Photo of Existing Concrete Medians RemovedExisting Concrete Medians Removed
  • Photo of Pathway Preparation on South West QuadrantPathway Preparation on South West Quadrant
  • Photo of Concrete Truck Apron Phase 1Concrete Truck Apron Phase 1
  • Photo of Concrete Curb Placed for Phase 1Concrete Curb Placed for Phase 1
  • Photo of Preparation for Curbing Phase 1Preparation for Curbing Phase 1
  • Photo of Intersection Before ConstructionIntersection Before Construction
  • Photo of Intersection Before ConstructionIntersection Before Construction