Community Development Fees
Building Related Fees ~ Impact Fees ~ Development Related Fees
| Building Related Fees |
| Miscellaneous Single Family Permits |
| $0 - $1000 |
$35.00* |
| $1,001 - $2,000 |
$70.00 |
| $2,001 - $3,000 |
$77.00 |
| $3,001 - $50,000 |
$77.00 + $9.00 per $1,000 or fraction of $1,000 |
| $50,001 and above |
$500.00 plus $3.50 per $1,000 or fraction of $1,000 over $50,000 |
| New Structure Single Family Permits |
| $500 - $2,000 |
$35.00 |
| $2,001 - $3,000 |
$38.50 |
| $3,001 - $50,000 |
Add $4.50 per $1,000 or fraction of $1,000 |
| $50,001 and above |
$250 plus $3.50 per $1,000 or fraction of $1,000 over $50,000 |
| Miscellaneous Commercial Permits |
| $0 - $1,000 |
$35.00 |
| $1,001 - $2,000 |
$70.00 |
| $2,001 - $3,000 |
$77.00 |
| $3,001 - $50,000 |
Add $77.00 plus $9.00 per $1,000 or fraction of $1,000 |
| $50,001 and above |
$500 plus $4.00 per $1,000 or fraction of $1,000 over $50,000 |
| Plan Checking Fee |
75% of permit fee - non-refundable |
| New Structure Commercial Permits |
| $500 - $2,000 |
$35.00 |
| $2,001 - $3,000 |
$38.50 |
| $3,001 - $50,000 |
Add $4.50 per $1,000 or fraction of $1,000 |
| $50,001 and above |
$250 plus $4.00 per $1,000 or fraction of $1,000 over $50,000 |
| Plans Checking Fee |
75 % of permit fee - non-refundable |
| Flat Fee Permits |
| Construction Trailers |
$25.00 |
| Demolition |
$50.00 |
| Electrical < 200 amps |
$25.00 |
| Electrical > 200 amps |
$35.00 |
| HVAC Change Out |
$50.00 per unit single family or multi-family residential |
| Landscape Irrigation |
$100.00 plus surety deposit of $200. Surety is refundable if final inspection is approved within 6 months of permit issuance. |
| Manufactured Homes |
$25.00 plus applicable impact fees` |
| Moving a Structure |
$100.00 |
| Spa (portable) |
$50.00 |
| Swimming Pool or Spa Single Family |
$100.00 plus surety deposit of $200. Surety is refundable if final inspection is approved within 6 months of permit issuance. |
| Swimming Pool or Spa Commercial |
$150.00 plus surety deposit of $200. Surety is refundable if final inspection is approved within 6 months of permit issuance. |
| Tent or Air Supported Structure |
$50.00 |
| Water Feature (Fountains) |
$100.00 plus surety deposit of $200. Surety is refundable if final inspection is approved within 6 months of permit issuance. |
| Other Building Related Fees |
| Reinspection |
$50.00 |
| Remark Single Family Plans |
$50.00 |
| Safety Inspection |
$100.00 |
| Single Family Plan Checking for Withdrawn Permits |
$50.00 or 10% of permit fee, whichever is larger |
| Stop Work |
Double Permit Fee plus possible fine |
* Fees shall be waived for single family construction alterations to enlarge, alter, repair, remodel or add additions to existing structures when the value of said alteration is less than $1,000. A permit is still required. Mechanical work is not subject to this waiver.
Building permit fees are based on a comparison of the declared value of construction and the minimum value of construction as outlined Building Valuation Data as published by the International Code Council. The fee is calculated using the higher of the two compared figures.
Impact Fees
Impact fees are due before a building permit will be issued for both residential and commercial construction. There are two types of Impact Fees. One is a Beaufort County fee and the other is a Town of Hilton Head Island fee.
The Beaufort County fee which is applicable in the Town of Hilton Head Island is composed of three charges: parks, roads and libraries. All three fees are applied to building permits for residential units including single family, manufactured homes, multi-family and duplex construction. Park and library fees are standard amounts; however road fees change based on the use. For example, a single family unit is charged $627 for parks, $468 for libraries and $1,134 for roads whereas a multifamily apartment unit is charged $627 for parks, $468 for libraries and $792 for roads. Only road fees apply to commercial construction and are assessed according to a separate schedule.
The Town of Hilton Head assesses a Transportation Impact Fee on all new development. Transportation impact fees are used to finance qualifying transportation improvements. Transportation impact fees for development are based on land use category and the number of trips generated by that particular use.
The fee required for single family residential construction, the fee is $635 for structures under 1,500 square feet of total construction (heated and unheated space combined). Structures over 1,500 square feet of heated and unheated space are charged a fee of $816. Manufactured housing is accessed a flat fee of $410 per unit.
For additional information and a schedule of impact fee calculations see Title 16 of the Town of Hilton Head Island Municipal Code
, Chapter 5, Article XVIII
| Planning & Development Related Fees |
| Planning Commission |
| Zoning Map Amendment |
$500 |
| Design Review Board |
| New Development-Conceptual |
$175 |
| New Development-Final |
$175 |
| Alteration or Addition |
$100 |
| Minor External Change |
$50 |
| Signs (including temporary sign) |
$25 + $25 per sign face |
| Waiver Request |
No Fee |
| Board of Zoning Appeals |
| Special Exception |
$200 |
| Variance |
$250 |
| Appeal |
$100 |
| Development Plan Review |
| Abbreviated Development Plan Review |
$50 + $10 per unit |
| Residential (multi-family) |
$200 + $10 per lot/unit |
| Non-Residential (other than Hotel/Motel) |
$500 + $20/1,000 SF of GFA |
| Hotel/Motel |
$200 + $10/room + Non-Residential Fee for other GFA |
| Horizontal Construction Only - No new buildings (excluding subdivisions) |
$100 |
| PUD Master Plan |
$300 + $2 per acre |
| Subdivision Review |
| Minor Subdivision Review |
$100 + $10 per lot |
| Major Subdivision Review |
$200 + $10 per lot |
| Pre-Clearing Inspection |
| First and Second Inspection |
No Fee |
| Each Reinspection |
$200 per inspection |
| Certificate of Compliance |
| First and Second Inspection |
No Fee |
| Each Reinspection |
$200 per inspection |
| Traffic Related Items |
| Traffic Impact Analysis Plan |
$250 |
Building Related Fees ~ Impact Fees ~ Development Related Fees